This project is a finished anti-seismic bracket

This project is a finished anti-seismic bracket, and the on-site workers practice: the finished bracket is a support structure that is already complete after the bracket is produced by the manufacturer, and the three systems of finished channel steel, tube bundle and accessories are combined according to the design style. There is no need for welding and drilling at the construction site, and some cases (such as C channel steel, adjusting rod) require simple cutting on site.

 image5

image6

image7

Installation diagram of single-pipe seismic support: water supply, hot water, fire pipeline (including fire hydrant, gas fire extinguishing, sprinkler, etc.) system above DN65. When the mass of accessories installed in the pipeline is greater than 25kg, lateral and longitudinal anti-vibration brackets should also be provided.

Single Pipe Side Support TS-(DN65~DN150)

image8 image9 image10

Single pipe bidirectional bracket LS-(DN65~DN150)

image11 image12 image13

Schematic diagram of lateral and longitudinal seismic support installation of rectangular air duct

Air duct side bracket

 image14 image15 image16

Duct two-way bracket

 image18 image17

Bridge side bracket

 image21 image20

Bridge two-way bracket

image22 image23 image24

The underground garage pipeline of this project adopts BIM comprehensive optimization, reasonably analyzes the clear height of the pipeline, and adopts the overall comprehensive bracket. After the installation is completed, the anti-seismic bracket will be installed on the site for a second time.